D&J Chemicals was founded in 2013, the enterprise is located in Jinzhou Economic Development Zone, Hebei Province. It covers an area of more than 27,000 square meters and has an annual yield of 10,000 tons of methyl cellulose.
Wall putty is a popular material used for smoothing and leveling walls before painting. It helps to create a smooth and even surface, ensuring that the paint adheres properly and gives a flawless finish. One of the key ingredients in wall putty is Hydroxypropyl Methylcellulose (HPMC), which plays a crucial role in its performance.
HPMC is a cellulose-based polymer that is derived from wood pulp or cotton fibers. It is widely used in the construction industry due to its excellent water retention properties, adhesion, and workability. When added to wall putty, HPMC acts as a thickener, binder, and water retention agent, making it easier to apply and ensuring that it adheres well to the wall surface.
Applying wall putty with HPMC requires a step-by-step process to achieve the desired results. Here is a guide to help you apply HPMC wall putty plasters skim coat effectively:
1. Surface Preparation:
Before applying wall putty, it is essential to prepare the surface properly. Remove any loose paint, dust, or debris from the wall using a scraper or sandpaper. Clean the surface thoroughly with water and allow it to dry completely. This step ensures that the wall putty adheres well and provides a smooth finish.
2. Mixing the Wall Putty:
To prepare the wall putty mixture, take a clean bucket and add the required amount of wall putty powder. Gradually add water while continuously stirring the mixture to avoid lumps. The consistency of the mixture should be smooth and creamy, similar to toothpaste. Let the mixture rest for a few minutes to allow the HPMC to hydrate fully.
3. Applying the Wall Putty:
Using a putty knife or trowel, apply a thin layer of wall putty on the prepared surface. Start from the bottom and work your way up, ensuring even coverage. Use long, sweeping strokes to spread the putty evenly. Avoid applying too much pressure, as it may cause unevenness or air bubbles. Allow the first coat to dry completely before applying the second coat.
4. Smoothing the Surface:
Once the first coat is dry, lightly sand the surface using sandpaper to remove any imperfections or roughness. Wipe off the dust with a clean cloth or brush. Apply the second coat of wall putty in the same manner as the first coat, ensuring a smooth and even finish. Repeat the sanding and dusting process if necessary.
5. Drying and Curing:
After applying the final coat of wall putty, allow it to dry completely. The drying time may vary depending on the weather conditions and thickness of the putty. Once dry, the wall putty forms a hard and durable surface. It is recommended to let the putty cure for at least 24 hours before painting.